Appendix A
Types of Consultants on the Design Team


Engineering Consultants

  • acoustical engineer
  • civil engineer
  • electrical engineer
  • environmental engineer
  • geotechnical engineer
  • hydrological engineer
  • mechanical engineer
  • process engineer
  • seismic engineer
  • structural engineer
  • traffic engineer

Specialist Consultants

  • acoustical consultant
  • airport consultant
  • architectural historian
  • art consultant
  • building code consultant
  • building envelope consultant
  • computer or CAD consultant
  • conservation or heritage architect
  • construction manager
  • cost consultant
  • demographer
  • economist
  • education consultant
  • elevator consultant
  • energy management consultant
  • environmental consultant or ecologist
  • facilitator
  • facilities manager
  • food service/kitchen consultant
  • graphic artist
  • hardware consultant
  • information technology consultant
  • hospital consultant
  • interior designer
  • laboratory consultant
  • land surveyor
  • landscape architect
  • lighting consultant
  • marketing consultant
  • programmer
  • psychologist
  • public relations consultant
  • quantity surveyor
  • realtor
  • scheduling consultant
  • security consultant
  • signage or graphics consultant
  • sociologist
  • specifications writer
  • sustainability or LEED consultant
  • technologist
  • theatre consultant
  • translator
  • transportation planner
  • urban and regional planner
  • urban designer
  • value engineering consultant
  • wayfinding consultant
  • wind/snow studies consultant