Appendix B
Selected National Associations of Consultants


Association of Consulting Engineering Companies (ACEC)

616-130 Albert Street, Ottawa, Ontario K1P 5G4
Tel: (613) 236-0569
Fax: (613) 236-6193
www.acec.ca


Canadian Construction Association (CCA)

75 Albert Street, Ottawa, Ontario K1P 6A4
Tel: (613) 236-9455
Fax: (613) 236-9526
www.cca-acc.com


Engineers Canada

180 Elgin St., Suite 1100, Ottawa, Ontario K2P 2K3
Tel: (613) 232-2474
Fax: (613) 230-5759
www.engineerscanada.ca


Canadian Institute of Quantity Surveyors (CIQS)

90 Nolan Court, Unit 19, Markham, Ontario L3R 4L9
Tel: (905) 477-0008
Fax: (905) 477-6774
www.ciqs.org


Canadian Society of Landscape Architects (CSLA)

P.O. Box 13594, Ottawa, Ontario K2K 1X6
Tel: (613) 622-5520
Fax: (613) 622-5870
www.csla.ca


Construction Specifications Canada (CSC)

120 Carlton Street, Suite 312, Toronto, Ontario M5A 4K2
Tel: (416) 777-2198
Fax: (800) 668-5684
www.csc-dcc.ca


Interior Designers of Canada (IDC)

220–6 Adelaide Street East, Toronto, Ontario M5C 1H6
Tel: 416.594.9310
Fax: 416.921.3660
www.interiordesigncanada.org