Appendix C
List: Trade Associations


This is a partial list of trade associations organized by the MasterFormat™ divisions with a link to the website. The list includes Canadian and U.S. references. The contact information can also be found through a search on the Internet or in the following sources:

  • National Master Specification (NMS)
  • Associations Canada – the Directory of Associations in Canada

Division 3

ACI   American Concrete Institute, www.concrete.org

ACPA   American Concrete Pavement Association, www.acpa.org

ACPA   American Concrete Pipe Association, www.concretepipe.org

CAC   Cement Association of Canada, www.cement.ca

CPCI   Canadian Precast Prestressed Concrete Institute, www.cpci.ca

CRSI   Concrete Reinforcing Steel Institute, www.crsi.org

NPCA   National Precast Concrete Association, www.precast.org

PCI   Precast/Prestressed Concrete Institute, www.pci.org


Division 4

BIA   Brick Industry Association, www.gobrick.com

BSI   Natural Stone Institute, www.naturalstoneinstitute.org

CBAC   Clay Brick Association of Canada, www.claybrick.ca

CMC   Canada Masonry Centre, www.canadamasonrycentre.com

CMCA   Canadian Masonry Contractors Association, www.canadianmasonrycontractors.com/designers

NCMA   National Concrete Masonry Association, www.ncma.org


Division 5

AA   Aluminum Association, www.aluminum.org

AWPA   American Wire Producers Association, www.awpa.org

AWS   American Welding Society, www.aws.org

CISC   Canadian Institute of Steel Construction, www.cisc-icca.ca

CSSBI   Canadian Sheet Steel Building Institute, www.cssbi.ca

NAAMM National Association of Architectural Metal Manufacturers, www.naamm.org


Division 6

AHA   American Hardboard Association, www.domensino.com/AHA

AITC   American Institute of Timber Construction, www.aitc-glulam.org

AWI   Architectural Woodworking Institute, www.awinet.org

AWMAC  Architectural Woodwork Manufacturers Association of Canada, www.awmac.com

AWPA   American Wood Protection Association, www.awpa.com

CPIA   Canadian Plastics Industry Association, www.plastics.ca

CWC   Canadian Wood Council, www.cwc.ca

FPS   Forest Product Society, www.forestprod.org

NHLA   National Hardwood Lumber Association, www.nhla.com

OFIA   Ontario Forest Industries Association, www.ofia.com

TPIC   Truss Plate Institute of Canada, www.tpic.ca


Division 7

AI   Asbestos Institute, www.theasbestosinstitute.com

CRCA   Canadian Roofing Contractors’ Association, www.roofingcanada.com

EIMA   EIFS Industry Members Association, www.eima.com

TIAC   Thermal Insulation Association of Canada, www.tiac.ca


Division 8

AAMA   American Architectural Manufacturers Association, www.aamanet.org

AGMCA   Architectural Glass and Metal Contractors Association, www.agmca.ca

CSDMA   Canadian Steel Door Manufacturers Association, www.csdma.org

GANA   Glass Association of North America, www.glasswebsite.com

NGA   National Glass Association, www.glass.org

WDMA   Windows & Door Manufacturers Association, www.wdma.com


Division 9

AWCI   Association of Wall and Ceiling Industries International, www.awci.org

CPCA   Canadian Paint and Coatings Association, www.canpaint.com

NFCA   National Floor Covering Association, www.nfca.ca

TCAA   Tile Contractors Association of America, www.tcaainc.org

TTMAC   Terrazzo, Tile and Marble Association of Canada, www.ttmac.com

WACCA   Walls and Ceilings Contractors Association, www.wacca.ca


Division 23

AHRI   Air Conditioning Heating and Refrigeration Institute, www.ahrinet.org

AMCA   Air Movement and Control Association Inc., www.amca.org

API   American Petroleum Institute, www.api.org

CGA   Canadian Gas Association, www.cga.ca

HRAI   Heating, Refrigerating and Air Conditioning Institute of Canada, www.hrai.ca

MCAC   Mechanical Contractors Association of Canada, www.mcac.ca

MSS   Manufacturers’ Standardization Society of Valve and Fittings Industry, www.msshq.org

SMACNA Sheet Metal and Air Conditioning Contractors National Association, www.smacna.org


Division 26

CECA   Canadian Electrical Contractors Association, www.ceca.org

EFC   Electro-Federation Canada, www.electrofed.com

IEEE   Institute of Electrical and Electronics Engineers, www.ieee.ca

NEMA   National Electrical Manufacturers Association, www.nema.org


Division 28

CANASA  Canadian Security Association, www.canasa.org


Division 32

AAPT   Association of Asphalt Paving Technologists, www.asphalttechnology.org


Division 33

AWWA    American Water Works Association, www.awwa.org