Navigation

  • Skip to Content

Product Admin Menu

RAIC
Contact Us
FR
  • About CHOP
  • Introduction Acknowledgements Sponsorship Photos credits Legal/Copyright Checklists Abbreviations Site Map
  • Contents
  • Part 1 : Theory and Background Part 2 : The Context of Practice Part 3 : Management of the Architectural Practice Part 4 : The Design Construction Program Part 5 : Management of the design Project Part 6 : Phases of the Design Project
  • Contact Us
  • About CHOP
    Introduction Acknowledgements Sponsorship Photos credits Legal/Copyright Checklists Abbreviations Site Map
  • Contents
    Part 1 : Theory and Background Part 2 : The Context of Practice Part 3 : Management of the Architectural Practice Part 4 : The Design Construction Program Part 5 : Management of the design Project Part 6 : Phases of the Design Project

PART SIX
Phases of the Design Project

Parts

  • Part 1 : Theory and Background
  • Part 2 : The Context of Practice
  • Part 3 : Management of the Architectural Practice
  • Part 4 : The Design Construction Program
  • Part 5 : Management of the design Project
  • Part 6 : Phases of the Design Project

Part 6 : Phases of the Design Project

Chapter 6.1
Predesign

Chapter 6.2
Schematic Design

Chapter 6.3
Design Development

Chapter 6.4
Construction Documents

Chapter 6.5
Construction Procurement

Chapter 6.6
Construction Contract Administration and Field Review

Chapter 6.7
Take-over Procedures, Commissioning, and Post-occupancy Evaluation

Chapter 6.8
Sample Templates for the Management of the Project

 

T 1-844-856-RAIC | chop@raic.org
Royal Architectural Institute of Canada
Institut royal d'architecture du Canada
  • Privacy
  • Legal/Copyright
  • About RAIC/IRAC
  • Site Map
 

The Canadian Handbook of Practice for Architects
© RAIC 2020