This checklist is meant to assist the architect to understand the typical scope of a traffic impact assessment (TIA) and/or parking study. A civil engineer or other similarly qualified subconsultant will conduct the work and prepare the deliverable. Please note that local authorities having jurisdiction usually have specific methodologies and formats that these studies and documents must follow.





