Permits and Inspections
Code Requirements
Shop Drawings and Samples
Mock-ups
Materials and Equipment
Fabrication
Workmanship
Handling and Storage
Protection
Erection and Installation
Relation to Prior Work
Co-operation Between Trades
Clean-up and Safety
Inspection and Testing
See “Inspection and Testing” earlier in this chapter. See also Appendix I – Checklist – Architect’s Role in Soils and Materials Testing at the end of this chapter.